Product Design graduate Mārtiņš Ēlerts, who now works for Dixon Yacht Design in Southampton, has just got back from the Cannes Yachting Festival where the new Sealine C430 motor boat was unveiled.
“This is not the first boat that I have worked on to hit the water, but it is the first project where I had the privilege to see the entire development process. From the beginning, the very first sketch, initial CAD model, all the way to a finished boat moored up at the Cannes Yachting Festival. My main role in this project was to build the exterior CAD model, which was then further developed by our team of engineers and naval architects.”
It’s a fairly rapid design process, as most of the fine design features are created on the go. Some quick dirty 20 second sketch might happen every now and then, but usually all the different ideas are quickly modelled in 3D and agreed on, or dismissed, without ever touching a piece of paper or pencil. The main advantage is the ability to see and evaluate every idea from all angles in the correct proportions in the actual environment. Might not sound like the traditional design process, but it’s the reality of working in a small team, with short deadlines.”
“Now just have to wait for the chance to go on sea trials with the team.”
And here is a video of it on water
https://www.youtube.com/watch?v=i1usynPl_zc